Falcon — Samara

Russia

The construction of the residential complex will consist of seven stages. In the first stage of construction, an elevenstorey four-section residential house with built-in non-residential premises is being constructed, and the commissioning period is 4th quarter of 2017. In parallel, the construction of the second stage with built-in non-residential premises, the commissioning period for the 4th quarter of 2018 is underway.

Apartments in the residential complex “Sokol” will be completely ready for living.

The apartments will be decorated in classical, neutral colors using modern materials: entrance metal door, interior doors, electrical and plumbing fixtures, wall and floor ceramic tiles, laminate, wallpapers. In addition, the balconies are designed: glazing, flooring on the loggias with ceramic tiles, painting the walls.

Installed products

Installed products

Installed products

Installed products